91st Military Police Barracks

Purcell was the design builder for the $54 million 91st Military Police Barracks Facility which included the construction of 3 new three story barracks buildings totaling approximately 250,000 SF. 

The complex was designed to house a total of 672 personnel on an approximately 37 acre site in Fort Drum, NY. The 3 story “L” shaped buildings were configured to create a contained “quad” type exterior space. Additional site considerations were given to account for future development on the site.

The barracks structure is load bearing light gauge metal framing selected for speed of construction, utilizing prefabricated wall panels. The design incorporated Anti-terrorism/Fort Protection (ATFP) as well as progressive collapse criteria. Each living unit contains a kitchen, a shared bath, and two single-person bedrooms. Laundry, vending and recycling areas are located in the center area of each building, and a day room is located in the first floor center area.

Category: Federal
Location: Fort Drum, NY
Architect: Beardsley Design Associates
Contract Value: $54,490,492
LEED: silver

Related Projects

AIT Barracks, Phase I

AIT Barracks, Phase I

This project consists of the first phase of dormitory/barracks construction in the TA5 area of Fort Lee, VA.
AIT Barracks, Phase I
Operational Readiness Training Center (ORTC)

Operational Readiness Training Center (ORTC)

This project has achieved LEED Gold certification for all five buildings on the 47 acre site. Sustainable features included an extensive…
Operational Readiness Training Center (ORTC)
Mahone Ave Barracks

Mahone Ave Barracks

This five-story building provides housing for 300 soldiers and 450 soldiers at surge capacity, for a total building square footage of…
Mahone Ave Barracks