Maneuver Area Training Equipment  Site (VA)

This Design/build project included the complete renovation of three (3) buildings, approximately 150,000 sf, containing maintenance, work bays, and support administrative spaces.

This facility was designed to provide maintenance and repair areas for the Virginia Army National Guard unit’s equipment, and increase hard standing parking areas, administrative support areas, vehicle painting and preparation areas, perimeter/security fencing, and associated site improvements. This project included the design of three (3) buildings, approximately 150,000 sf, containing maintenance, work bay, and support administrative spaces. Each work bay has a petroleum/oil/lubricant central distribution system, overhead bridge crane service and large overhead doors. A fourth building contains a sand blast paint preparation booth and a paint spray booth for repaint of large tracked military vehicles. The project also included an unheated warehouse and secure vault. Construction included the demolition of six (6) World War II-era structures including all utilities and surrounding improvements associated with these structures. Asbestos and lead abatement programs were developed prior to the demolition of the structures. A storm water pollution and prevention plan was developed for the 24-acre site in two months, which required two (2) 20,000 SF subsurface storm water detention basins.

Category: Industrial
Location: Fort Pickett, VA
Architect: US Army Corps of Engineers, Huntsville Division, Setty & Associates, LTD
Contract Value: 17,702,127

Related Projects

Hazardous Material Storage Facility

Hazardous Material Storage Facility

This 23,622 sf building provides a hazardous material storage facility to accommodate packaged petroleum, oils and lubricants along with…
Hazardous Material Storage Facility
7th Engineering  Operations Facility

7th Engineering Operations Facility

The 7th Engineering Battalion Operations project includes construction of 4 new buildings totaling 137,342 square feet on a 20 acre site at…
7th Engineering Operations Facility
Fire and Emergency Services - Phase III

Fire and Emergency Services - Phase III

This Design/Build project consists of the design and construction of the third phase of the Fire and Emergency Services Center Facility at…
Fire and Emergency Services - Phase III